According to the master plan, the new dump for the Herceg Novi municipality would be built in the Duboki do (DEEP VALLEY) in Ubli.
Herceg Novi – On a tender for the construction of the main project of arranging and closing a damp in Ubli there were three offers received.
The main project, when the best offer is chosen, should be terminated in two months. For the production of that project the municipality Herceg Novi has singled out 25.000 euros.
Herceg Novi deposits its trash on a dump which is 17 km away from the town, which, often, and especially during the winter, is a great problem.
The dump in Dugonja, on the slopes of Orjen, on which yearly about 13 thousand tones of waste is being deposited, does not satisfy not one single sanitary – technical condition. That is why several years ago the republic ecologic inspector ordered its closing. The local people who live in the village Ubli have also demanded the closing of the dump, and the making of that project is the first step towards that goal.
In the next five years one part of the dump at a time should be closed down and arranged. The entire project would cost 870.000 euros. In the meantime, a new place for the new sanitary dump for the Herceg Novi Municipality should be determined.
According to the Master plan, the new dump would be built in the Duboki do on Ubli. The experts claim that the new dump would fulfill all the sanitary – technical conditions, because it is one kilometer away from the village, and it the regulation of the waste waters is also projected, so there is no danger of the pollution of the Morinj river basin.
A ner dump would be made on the slopes of Orjen at 1.100 m height above sea level, and it is 17 km away from the town. The road by which the trucks would go is in a bad shape, so in the city “Cistoca” (CLEANNESS) they point out that as an impeding circumstance.
According to some earlier calculations, the first phase of the construction of the dump would cost one million and two hundred thousand of euros.
There are two more options for the construction of the dump for the deposit of the waste for Herceg Novi Municiplaity. One is the construction of the regional dump for the Municipalities Kotor, Tivat, Budva and Herceg Novi.
At one point the Norwegians were interested to help to find the money for the constructions of the regional dumps for the Municipalities Herceg Novi, Trebinja and Dubrovnik.
S.K.